Dienstleistungen
Um einen reibungslosen Ablauf zu gewährleisten, bitten wir Sie, online einen Termin bei dem/der zuständigen Sachbearbeiter/in zu vereinbaren.
Um einen reibungslosen Ablauf zu gewährleisten, bitten wir Sie, online einen Termin bei dem/der zuständigen Sachbearbeiter/in zu vereinbaren.
If you are the operator of a system in which volatile organic solvents (VOC) are used, you must have the solvent emissions checked regularly by means of individual measurements under certain conditions.
The measurements must be carried out by a notified body (measuring centre) in accordance with Section 29b of the Federal Immission Control Act.
You must immediately draw up a measurement report on the results of the measurements and, if the installation does not require a licence, keep it on site for 5 years. You must submit the measurement report at the request of the responsible immission control authority. Measurement reports on emission measurements in installations requiring authorisation must be submitted to the responsible immission control authority no later than 12 weeks after completion of the measurements.
The responsibilities in the area of immission control are regulated in the Immission Control Competence Ordinance of the state of Baden-Württemberg.
In most cases, the competent authority for plants that fall under the 31st BImSchV is the local lower immission control authority, i.e
A different responsibility applies in the following cases (e.g. for companies that are subject to the European Industrial Emissions Directive, the Hazardous Incident Ordinance or mining law):
Departments 5, Environment of the respective locally responsible regional councils are the competent immission control authorities for company premises on which
exists or is to be constructed.
Department 9, State Office for Geology, Raw Materials and Mining of the Freiburg Regional Council is also the state-wide competent immission control authority for
If you have newly installed or significantly modified your system, you must have the first measurement carried out within 3 to 6 months of commissioning. Subsequently, the measurement must be carried out every 3 years.
If your installation requires a licence, you must submit the measurement report to your local immission control authority no later than 12 weeks after the measurements have been completed.
Complete measurement report in accordance with Annex A of Guideline VDI 4220 Sheet 2 (November 2018 edition) with information on, among other things
None
Please ensure that you submit the measurement report to the immission control authority responsible for your plant.
Bundes-Immissionsschutzgesetz (BImSchG)
Verordnung zur Begrenzung der Emissionen flüchtiger organischer Verbindungen bei der Verwendung organischer Lösungsmittel in bestimmten Anlagen – 31. BImSchV